More of the Bridge - 11 photos
- Waipuka Admin
- Dec 6, 2018
- 1 min read
Updated: Dec 8, 2018

Preparing the site for the 100T crane.

The crane and its counter weights arriving.


The two diggers that prepared the site.



The beams have arrived ... it was a very tight drive down the road.

The beams and the concrete slabs in place.



Comentários